Crewe MMU for Eric Wright was a challenging project due to the busy live University campus all around our work areas, our works included:

Major reduced level excavations and muck shift

Twin Tubosider units at 1.8m diameter laid at a depth of 4.5 m and approx 80 linear metres long

4no car park constructions including all kerbing/edgings and Aco channels

Foul and Surface water drainage ranging from 150mm clay to 650mm concrete

All Surface water drainage exitted Site through a flow restrictor into the local brook to bottom of Site

All access road formations to HGV specification, approx 250 linear metres of build

Tree pits/Islands and all hard landscaping with major top soil spread site wide

All flagging and paviours to main walkways and entrances

Street furniture fitment