Christ Church for Dawn Consult, located at the back of the Church is a former graveyard that is to be transformed into a Community centre, as the ground is in a very poor state a 600mm piling mat has to be completed before the insertion of some 80 mini driven piles, pile cap and ring beam formation follow before suspended concrete slab is poured.
Drainage is state of the art and relies on shallow soakaways so as not to disturb any of the remaining burial plots located some 600mm down. BREEAM excellent rating is to be achieved in what is a complicated tight project for Dawn Consult, a new P.C to our fold