This project was the construction of a 4 storey health centre and associated car park in a tight town centre site. Our package included:
Cutting down of 180 piles and installing ground beams and pile caps.
Foul and surface water drainage, including final connections
All external works including pathways, steps/disabled ramp
Integrated car park including all kerbs and Aco drainage
Planter bases and tree pits and all hard landscaping
Separate car park constructed some 500 metres from the site which included all drainage, kerbs, stone and services.